HOME /

Offshore Korea 2012 has come to an end and we would like to thank everyone who came to visit us in Busan.

HOME /

The recent Oil and Gas Show in Rio de Janeiro was attended by Malcolm Johnston and Al Cohen.

HOME /

New requirements from the latest edition of CAP 437 (7th edition from May 2012) and Helideck Certification Agency (HCA), states that all systems shall be equipped with a breakaway/weak link on the grounding cable.

Let us know if there is anything we can do
to help you!

Consent(Required)
This field is for validation purposes and should be left unchanged.