Airports

HOME /

With the Energy Institute’s removal of EI 1583, Imenco have installed 100+ replacements around the world on both offshore and airport installations. The work involves replacing the existing monitors with EI 1599 Dirt Defence elements and fitting EI 1598 Water Sensors. Value Various Delivery Time Various Scope of Work:

HOME /

340,000L total fuel storage capacity, including a pump and refuelling system JIG Complaint. The installation is in antarctica, with cold temperatures, the system will maintain the fuel temperature to an acceptable level for storing and refuelling aircrafts. Delivery Time 14 Months Scope of Work:

HOME /

4off specialist dual hose dispenser cabinets for an airfield in Nigeria. The dispensers are fitted with 2off hose reels with 60m hoses, one for gravity (overwing) refuelling and the other for pressure (underwing) refuelling. Fitted in a weatherproof cabinet for protection against the elements. Delivery Time 6 Months Scope of Work:

Let us know if there is anything we can do
to help you!

Consent(Required)